Lennox Lateral
- Construction layout, as-built, and permitting services.
- 90% of the 2 mile 16ˮ pipeline was installed by horizontal directional drill (HDD).
- The HDD design follows an existing roadway with a 55 degree horizontal bend.
- Required permitting with TxDOT and the City of Arlington.